
Projects: Cable Routes, Civils and Renewables
HV cable routes, substation civils, battery storage and solar farm builds, and multi-utility works.
All projects

Indian Queens private wire: 33kV cable route
Civils and cable installation for Novus Power's 7.8km 33kV private wire, from the Tregonning Solar Farm to National Grid's Indian Queens substation in Cornwall.
View project
Wanlip STW inlet works civils
The inlet civils package at Severn Trent's Wanlip Sewage Treatment Works near Leicester, built for Kier inside the live, operational works.
View project
Wanlip STW 11kV substation build
Services enabling and civil works for a new 11kV substation and Severn Trent's new 11kV switch room at Wanlip Sewage Treatment Works, for Kier.
View project
Burwell Solar Farm
A 49.8 MW solar farm on an 80 hectare site, connected directly to the National Grid substation at Burwell. Late 2022 to August 2023.
View project
33kV cable route, Dunmow
A 33kV cable route and its ducting at Dunmow. 2023.
View project
11kV cable installation at Whittle Laboratory
An 11kV cable route and its ducting at the Whittle Laboratory in Cambridge. 2023.
View project
Thetford cable route & civil build
A 6 km route with dual 33kV circuits and fibre from UK Power Networks' Barnham substation, followed by the civils for a new primary substation. 2023.
View project
49.9 MW battery energy storage
A 49.9 MW battery energy storage site at Brentwood, next to a 132kV substation. January to October 2022.
View project
Multiple utility services in Essex
Deep excavations so HV and LV cables, drainage and water could be lowered and diverted, working with the asset owners. May to October 2021.
View project
Deep excavations for sewer and water service
Fifteen excavations, more than 3 metres deep at the deepest, to expose and support an existing sewer and other utilities for a diversion route. August to October 2021.
View project
Construction of 49.9MW battery storage facility
All the civils, drainage and electrical ducting for a new 49.9MW battery storage facility. February to October 2021.
View project
Refurbishment of overhead line circuits
Two 33kV and two 11kV underground ducted circuits on an overhead line refurbishment: about 31,800 metres of cable and 13 joint bays. August 2020 to May 2021.
View project
Irrigation main installation
A high-pressure irrigation main with thrust blocks, two road crossings, reinstatement and full system testing. February to March 2021.
View project
5 x 33kV with fibre optic
Five 33kV circuits with fibre for a new data centre and a generation site: about 53,000 metres of cable in a fully ducted route along main roads. August 2018 to April...
View project
HV cable installations
Two 33kV circuits and fibre over about 25 km between a DNO substation and a new client substation, fully ducted, with 45 joint bays. May 2018 to September 2019.
View projectPlanning a scheme?
Tell us the route, the voltage and the programme, and we will come back to you.
