Ground Utilities excavator working on a cable route
Projects

Projects: Cable Routes, Civils and Renewables

HV cable routes, substation civils, battery storage and solar farm builds, and multi-utility works.

All projects

Trencher cutting the 33kV cable route along a field edge in Cornwall
Cable InstallationCornwallJune 2026 to February 2027 (in progress)

Indian Queens private wire: 33kV cable route

Civils and cable installation for Novus Power's 7.8km 33kV private wire, from the Tregonning Solar Farm to National Grid's Indian Queens substation in Cornwall.

View project
New inlet screens plant on its concrete slab at Wanlip Sewage Treatment Works
Sewers & WaterLeicestershireMarch 2026 to December 2026 (in progress)

Wanlip STW inlet works civils

The inlet civils package at Severn Trent's Wanlip Sewage Treatment Works near Leicester, built for Kier inside the live, operational works.

View project
New 11kV substation building at Wanlip Sewage Treatment Works, with a wind turbine behind
ConstructionLeicestershireNovember 2025 to February 2026

Wanlip STW 11kV substation build

Services enabling and civil works for a new 11kV substation and Severn Trent's new 11kV switch room at Wanlip Sewage Treatment Works, for Kier.

View project
Burwell project
Solar FarmBurwell4th Quarter 2022 to August 2023

Burwell Solar Farm

A 49.8 MW solar farm on an 80 hectare site, connected directly to the National Grid substation at Burwell. Late 2022 to August 2023.

View project
Dunmow flitch way site walk
High Voltage Cable SystemsDunmow, Essex2023

33kV cable route, Dunmow

A 33kV cable route and its ducting at Dunmow. 2023.

View project
Refurbishment of overhead line circuits
Cable InstallationCambridgeshire2023

11kV cable installation at Whittle Laboratory

An 11kV cable route and its ducting at the Whittle Laboratory in Cambridge. 2023.

View project
11kV cable installation at the Whittle Laboratory
Cable InstallationThetford2023

Thetford cable route & civil build

A 6 km route with dual 33kV circuits and fibre from UK Power Networks' Barnham substation, followed by the civils for a new primary substation. 2023.

View project
The facility to have a battery energy storage system
ConstructionBrentwood, EssexJanuary 2022 to October 2022

49.9 MW battery energy storage

A 49.9 MW battery energy storage site at Brentwood, next to a 132kV substation. January to October 2022.

View project
Multi utility
Multiple UtilitiesEssexMay 2021 to October 2021

Multiple utility services in Essex

Deep excavations so HV and LV cables, drainage and water could be lowered and diverted, working with the asset owners. May to October 2021.

View project
49.9 MW battery energy storage
Sewers & WaterSouth West LondonAugust 2021 to October 2021

Deep excavations for sewer and water service

Fifteen excavations, more than 3 metres deep at the deepest, to expose and support an existing sewer and other utilities for a diversion route. August to October 2021.

View project
Multi-utility works on a site in Essex
ConstructionCambridgeshireFebruary 2021 to October 2021

Construction of 49.9MW battery storage facility

All the civils, drainage and electrical ducting for a new 49.9MW battery storage facility. February to October 2021.

View project
Multi-utility works on a site in Essex
Overhead CablesNorfolkAugust 2020 to May 2021

Refurbishment of overhead line circuits

Two 33kV and two 11kV underground ducted circuits on an overhead line refurbishment: about 31,800 metres of cable and 13 joint bays. August 2020 to May 2021.

View project
11kV cable installation at the Whittle Laboratory
IrrigationEssexFebruary 2021 to March 2021

Irrigation main installation

A high-pressure irrigation main with thrust blocks, two road crossings, reinstatement and full system testing. February to March 2021.

View project
Traffic control signs and cones for road works on a busy main road, with a bus passing
Cable InstallationsLondonAugust 2018 to April 2020

5 x 33kV with fibre optic

Five 33kV circuits with fibre for a new data centre and a generation site: about 53,000 metres of cable in a fully ducted route along main roads. August 2018 to April...

View project
Ground Utilities street works in a fenced-off footway beside a residential road
Cable InstallationCambridgeshireMay 2018 to September 2019

HV cable installations

Two 33kV circuits and fibre over about 25 km between a DNO substation and a new client substation, fully ducted, with 45 joint bays. May 2018 to September 2019.

View project