Substation and battery storage site built with Ground Utilities civils
NERS approved · LV to 132kV · All six DNOs

Multi utility, civils and renewables contractor in Cambridgeshire

We build HV cable routes, substation and compound civils, and the groundworks behind battery storage and solar farms. We work from Cottenham, near Cambridge, with our own plant and gangs.

1,095+days worked with no lost time incidents
800+ MWconnected
112,500 mof cable pulled
50,000+ mexcavated in three years
Why Ground Utilities

One team from first dig to energisation

  • One point of contact throughout, with a dedicated contract manager.
  • Our own plant and equipment, so we control the programme.
  • Full turnkey packages, or our skilled labour on your scheme.
  • Every operative CSCS/EUSR registered and every supervisor SMSTS qualified.
  • A team with over 30 years of collective experience.
  • We work with local highway authorities to secure the permits a route needs.

About us

Ground Utilities team with excavators and company vehicles on site beneath overhead power lines
Accreditations

Approved to work on the network

All accreditations
ISOQAR registered and UKAS Management Systems logos

ISO 9001, ISO 14001 and ISO 45001

Certified to ISO 9001 (quality), ISO 14001 (environment) and ISO 45001 (occupational health and safety) since November 2025, by ISOQAR under UKAS accreditation. Certificate number 1122.

NERS logoVerified on the public register

NERS

Full NERS approval for cable laying at LV, 11kV, 20kV, 33kV, 66kV and 132kV, and for civil works, with all six distribution network operators, including UK Power Networks.

Check us on the LRQA NERS register
Achilles UVDB Accredited Silver+ Supplier stampAchilles Sustainability Score 2026, four stars

Achilles UVDB, Silver+

Validated by Achilles as an Accredited Silver+ supplier on the Utilities Vendor Database (UVDB), the supplier qualification scheme used by UK utilities. Achilles sustainability rating for 2026: four stars, with a score of 79. Achilles ID 00189186.

What clients say

Delivered on programme

“This is just a quick thank you from us, the Berkeley team. We successfully energised our project today, and Ground Utilities played a big part in this with you guys carrying out the grid route.”

Berkeley

“It's a team effort to get the results and GUL have been great on the project in both cable route and on-site civils. The project has also been congratulated by the client and the investors.”

Client feedback

“EPC have been very impressed on how GUL have managed and worked alongside EPC to resolve issues in a professional and timely manner, while sticking to project deadlines throughout.”

EPC contractor

Planning a scheme?

Tell us the route, the voltage and the programme, and we will come back to you.