Battery storage (BESS) and solar farm civils contractor
We are the civils contractor for battery energy storage (BESS) and solar farm sites: foundations, bunds, drainage, site-wide electrical ducting and the cable route to the grid connection.
Battery storage civils
Ground Utilities builds the civils and utility works that a battery storage site depends on, for EPCs, ICPs and principal contractors. We do the work in-house with our own plant and equipment, with a dedicated contract manager as one point of contact.
- Civil foundations for the battery units, transformers and other equipment, including auger foundations
- Bunds and walls
- Access roads and the site compound
- Drainage for the whole site, with pumped, gravity, interceptor and attenuation controls
- Electrical ducting across the whole site, and cable installation for 33kV and 132kV cables
- Cable routes to the grid connection, from 240V to 132kV
Battery storage sites we have built
For a 49.9MW battery storage facility in Cambridgeshire (February to October 2021) we carried out all the civils, drainage and electrical ducting for the whole site: equipment foundations, bunds and walls, auger foundations, the access road and compound, site-wide drainage, and ducting and cable installation for the 132kV and 33kV cables. The works were completed within the timescale.
At Brentwood, Essex we carried out construction work for a 49.9 MW battery energy storage site next to a 132kV substation, from January to October 2022.
Solar farm civils
- Site preparation and clearance
- Grading and earthworks
- Foundations
- Drainage
- Trenching, electrical ducting and cable laying
We worked on Burwell Solar Farm, a 49.8 MW site on 80 hectares in south east Cambridgeshire that connects directly to the National Grid substation at Burwell, from the fourth quarter of 2022 to August 2023.
The grid connection route
We hold full NERS approval for cable laying from LV to 132kV and for civil works, with all six distribution network operators. We build the route and install the cable; jointing, terminating and the final live connection are done by others. See HV cable installation, and our guide to BESS site groundworks.
Each project is carefully managed so the work is completed safely, within the agreed programme and to a high standard. Pricing is given on application.
Frequently asked questions
Is Ground Utilities a battery storage contractor?
We are a civils and utilities contractor for battery storage (BESS) and solar farm sites. We build the foundations, bunds, drainage, access roads, site-wide electrical ducting and the cable route to the grid connection, for EPCs, ICPs and principal contractors.
Who do you work for on battery storage projects?
EPCs, ICPs and principal contractors. We can take on a full turnkey contract or supply our skilled labour.
What does Ground Utilities build on a battery storage site?
Foundations and bases for battery units and transformers, site drainage, electrical ducting across the whole site and cable routes to the grid connection.
What do you build on a solar farm?
Site preparation and clearance, grading and earthworks, foundations, drainage, and the trenching, electrical ducting and cable laying.
Which battery storage and solar sites have you worked on?
A 49.9MW battery storage facility in Cambridgeshire in 2021, a 49.9 MW battery energy storage site in Brentwood, Essex in 2022, and Burwell Solar Farm, a 49.8 MW site in Cambridgeshire, in 2022 and 2023.
Do you build the cable route to the grid connection?
Yes. We build cable routes from 240V to 132kV and hold NERS approval for cable laying and civil works. We do not joint or terminate cables or make the final live connection.
At a glance
- Coverage
- England and Wales, from Cottenham, Cambridgeshire
- Approval
- NERS cable laying LV to 132kV and civil works
- Battery storage
- 49.9MW in Cambridgeshire, 2021; 49.9 MW in Brentwood, 2022
- Solar
- Burwell Solar Farm, 49.8 MW, 2022 to 2023
- Cables
- Ducting and installation for 33kV and 132kV
- Projects
- 3 on this site
Talk to us about your scheme
Call 01223 423918 or send the details and we will come back to you.
Send an enquiryBattery storage and solar farms projects
All projects
Burwell Solar Farm
A 49.8 MW solar farm on an 80 hectare site, connected directly to the National Grid substation at Burwell. Late 2022 to August 2023.
View project
49.9 MW battery energy storage
A 49.9 MW battery energy storage site at Brentwood, next to a 132kV substation. January to October 2022.
View project
Construction of 49.9MW battery storage facility
All the civils, drainage and electrical ducting for a new 49.9MW battery storage facility. February to October 2021.
View projectOur other services

Multi utility services
Electrical ducts and cabling from 240V to 132kV, fibre ducts, and the routes for several utilities on one site.
Find out more
Civil construction
Deep excavations, reinforced concrete foundations and structures, substation and compound civils, drainage.
Find out more
Waste water
Mains sewers, sewer diversions, irrigation mains and deep excavations to lower and divert existing services.
Find out moreGuides for this work
All guides
BESS sites in the UK: what the groundworks and civils involve
What the civils package on a UK battery storage (BESS) site covers: foundations, bunds, drainage, fire access, cable ducting and the grid connection.
Read the guide
You have a Gate 2 offer: what happens next on the cable route and civils
Got a Gate 2 offer? Sign within the deadline, post securities, then secure cable route land rights and permits. Dates and milestones as at 18 Nov 2026.
Read the guide
Substation types and the civils each one needs
UK substations step voltage down in stages: grid, primary and secondary. What each type is, and the civils it needs, from bases and bunds to fencing.
Read the guidePlanning a scheme?
Tell us the route, the voltage and the programme, and we will come back to you.