
Civil Engineering and Groundworks in Cambridgeshire
Civils, groundworks and utilities from our base at Highdrove Farm, Cottenham, for schemes in Cambridge, Ely, Newmarket and across the county.
A local contractor for Cambridgeshire schemes
Ground Utilities Ltd is a civil engineering, groundworks and multi-utility contractor based at Highdrove Farm in Cottenham, north of Cambridge. Our work in the county includes a 25 km 33kV cable route, a 49.9 MW battery storage build, Burwell Solar Farm and an 11kV cable route at the Whittle Laboratory. We also work across the rest of England and Wales.
Civils and groundworks
Our civil construction team takes on schemes from small foundations to full civil structures for power generation and water management, including:
- Earthworks, bulk dig and clearance
- Deep excavations
- Reinforced concrete foundations and structures
- Drainage, interceptor tanks and pumping systems
- Piling and external works
Utilities and cable routes
As a multi-utility contractor we install electrical duct and cabling from 240V to 132kV, fibre duct and cabling, mains sewers and irrigation systems. We hold full NERS approval for cable laying at LV, 11kV, 20kV, 33kV, 66kV and 132kV, and for civil works, with all six distribution network operators, including UK Power Networks (LRQA NERS register).

Where we work
From Cottenham we work across Cambridgeshire, including Cambridge, Ely and Newmarket on the Suffolk border, and on schemes in Essex, Norfolk, London and further afield.
Close by, our Thetford cable route carried dual 33kV circuits and fibre for 6 km from UK Power Networks' Barnham substation, and we built a 33kV cable route at Dunmow in Essex.
At a glance
- Base
- Highdrove Farm, Cottenham, Cambridgeshire
- Covers
- Cambridge, Ely, Newmarket and the county, and England and Wales
- Approvals
- ISO 9001, 14001 and 45001, NERS, Achilles UVDB Silver+, Constructionline Gold
Planning a scheme in Cambridgeshire?
Call 01223 423918 or email info@ground-utilities.co.uk. Pricing is given on application.
Send an enquiryOur Cambridgeshire projects

HV cable installations
Two 33kV circuits and fibre over about 25 km between a DNO substation and a new client substation, fully ducted, with 45 joint bays. May 2018 to September 2019.
View project
Construction of 49.9MW battery storage facility
All the civils, drainage and electrical ducting for a new 49.9MW battery storage facility. February to October 2021.
View project
Burwell Solar Farm
A 49.8 MW solar farm on an 80 hectare site, connected directly to the National Grid substation at Burwell. Late 2022 to August 2023.
View project
11kV cable installation at Whittle Laboratory
An 11kV cable route and its ducting at the Whittle Laboratory in Cambridge. 2023.
View projectPlanning a scheme?
Tell us the route, the voltage and the programme, and we will come back to you.
