Substation civil construction by Ground Utilities
Services

NERS accredited ICP civils contractor, LV to 132kV

Full NERS approval for civil works and for cable laying from LV to 132kV, with all six distribution network operators. We build the contestable civils and cable route for ICPs, IDNOs, EPCs and developers, from Cottenham, Cambridgeshire, across England and Wales.

Civils and cable laying for new connections and grid connections

On a new electricity connection, much of the work is contestable: an independent connection provider (ICP) can build it instead of the network operator. To do that work, a contractor needs NERS accreditation for each scope it carries out. Ground Utilities holds full NERS approval for two of them: civil works, and cable laying at LV, 11kV, 20kV, 33kV, 66kV and 132kV, with all six distribution network operators, including UK Power Networks. You can check it on the LRQA NERS register.

In November 2026 the LRQA NERS register listed 545 accredited providers, and 45 of them, Ground Utilities among them, held full approval for cable laying at 132kV.

What we build

  • Site investigations before excavation
  • Trenching in highway, footpath, verge and farmland
  • Duct installation, with double-stacked ducts where the trench has to stay narrow
  • Joint bay construction, and reinstatement of each bay after jointing
  • Cable installation, from 240V to 132kV, with fibre alongside where a scheme needs it
  • Substation and compound civils
  • Reinstatement of the highway, footpath, verge or field

We do the work in-house with our own plant and equipment. Every job has a dedicated contract manager as one point of contact. We can take on a full turnkey contract or supply our skilled labour.

What we do, and what others do

Our NERS approval does not include cable jointing or design. We build the route and install the cable. We do not joint or terminate cables, and we do not make the final live connection to the network. The network operator or the client's connection provider does that. So on a full connection we work for, or alongside, the ICP or network operator that holds those scopes. We do not make connection applications to network companies, and we do no gas work.

Who we work for

ICPs, EPCs, utility contractors and principal contractors. On battery storage and solar sites we also build the site civils and the cable route to the grid connection: see battery storage and solar farm civils.

Routes and substations we have built

  • HV cable installations: Two 33kV circuits and fibre over about 25 km between a DNO substation and a new client substation, fully ducted, with 45 joint bays. May 2018 to September 2019.
  • 5 x 33kV with fibre optic: Five 33kV circuits with fibre for a new data centre and a generation site: about 53,000 metres of cable in a fully ducted route along main roads. August 2018 to April 2020.
  • Indian Queens private wire: 33kV cable route: A 7.8km 33kV private wire from the Tregonning Solar Farm to National Grid's Indian Queens substation, with about 46km of cable and 19 joint bays. In progress.
  • Thetford cable route & civil build: A 6 km route with dual 33kV circuits and fibre from UK Power Networks' Barnham substation, followed by the civils for a new primary substation. 2023.
  • Refurbishment of overhead line circuits: Two 33kV and two 11kV underground ducted circuits on an overhead line refurbishment: about 31,800 metres of cable and 13 joint bays. August 2020 to May 2021.

Substation civils include the new primary substation at Thetford, with two transformer bunds and a customer switch room, and a new 11kV substation and switch room at Wanlip Sewage Treatment Works, for Kier.

Street works and permits

Our supervisors and operatives hold NRSWA street works cards. Where a client needs it, we have applied for and managed the Section 50 licence and highway permits ourselves, as on the Indian Queens private wire in Cornwall.

Safety and approvals

All our operatives are CSCS/EUSR registered as a minimum and all our supervisors are SMSTS qualified. We are certified to ISO 9001, ISO 14001 and ISO 45001, an Achilles UVDB Silver+ supplier and a Constructionline Gold member. See our accreditations.

Where we work

From Highdrove Farm in Cottenham, north of Cambridge, we work across Cambridgeshire, including Cambridge, Ely and Newmarket, and across the rest of England and Wales. Recent cable routes have been in Cambridgeshire, Norfolk, Essex, London and Cornwall. For how ICPs, IDNOs and network operators fit together, see our guide NERS and ICPs explained.

Frequently asked questions

Is Ground Utilities NERS accredited?

Yes. We hold full NERS approval for civil works, and for cable laying at LV, 11kV, 20kV, 33kV, 66kV and 132kV, with all six distribution network operators, including UK Power Networks. You can check it on the LRQA NERS register.

Is Ground Utilities an ICP?

We are a NERS accredited provider for civil works and cable laying, two of the contestable scopes on a new connection. We do not hold jointing or design approval, so on a full connection we work for, or alongside, an ICP or network operator that does.

Which NERS scopes do you not cover?

Cable jointing and design. We also do not make the final live connection, make connection applications or do gas work.

Do you build to 132kV?

Yes. Our cable laying approval runs to 132kV. In November 2026, 45 of the 545 providers on the NERS register held full approval for cable laying at 132kV.

Who do you work for?

ICPs, EPCs, utility contractors and principal contractors.

Do you build the civils for a grid connection?

Yes. We build the cable route to the grid connection, from 240V to 132kV, including on battery storage and solar sites, where we also build the site civils. Jointing, terminating and the final live connection are done by others.

Do you work in Cambridgeshire?

Yes. We are based at Highdrove Farm, Cottenham, Cambridgeshire, and work across the county and the rest of England and Wales.

Can you supply labour only?

Yes. We can take on a full turnkey contract or supply our skilled labour.

At a glance

NERS scopes
Civil works; cable laying at LV, 11kV, 20kV, 33kV, 66kV and 132kV
Network operators
All six DNOs, including UK Power Networks
132kV cable laying
45 of 545 NERS providers held full approval, November 2026
Not in scope
Cable jointing, design, final connections
Base
Cottenham, Cambridgeshire; England and Wales
Also
ISO 9001, 14001 and 45001, Achilles UVDB Silver+, Constructionline Gold

Talk to us about your scheme

Call 01223 423918 or send the details and we will come back to you.

Send an enquiry

Related projects

All projects
Multiutility project of worksite congrested road space
Cable InstallationCambridgeshireMay 2018 to September 2019

HV cable installations

Two 33kV circuits and fibre over about 25 km between a DNO substation and a new client substation, fully ducted, with 45 joint bays. May 2018 to September 2019.

View project
Trencher cutting the 33kV cable route along a field edge in Cornwall
Cable InstallationCornwallJune 2026 to February 2027 (in progress)

Indian Queens private wire: 33kV cable route

A 7.8km 33kV private wire from the Tregonning Solar Farm to National Grid's Indian Queens substation, with about 46km of cable and 19 joint bays. In progress.

View project
Ground Utilities recent projects
Cable InstallationsLondonAugust 2018 to April 2020

5 x 33kV with fibre optic

Five 33kV circuits with fibre for a new data centre and a generation site: about 53,000 metres of cable in a fully ducted route along main roads. August 2018 to April...

View project
11kV cable installation at whittle laboratory
Cable InstallationThetford2023

Thetford cable route & civil build

A 6 km route with dual 33kV circuits and fibre from UK Power Networks' Barnham substation, followed by the civils for a new primary substation. 2023.

View project
Multiple utility services in essex
Overhead CablesNorfolkAugust 2020 to May 2021

Refurbishment of overhead line circuits

Two 33kV and two 11kV underground ducted circuits on an overhead line refurbishment: about 31,800 metres of cable and 13 joint bays. August 2020 to May 2021.

View project
New 11kV substation building at Wanlip Sewage Treatment Works, with a wind turbine behind
ConstructionLeicestershireNovember 2025 to February 2026

Wanlip STW 11kV substation build

Services enabling and civil works for a new 11kV substation and Severn Trent's new 11kV switch room at Wanlip Sewage Treatment Works, for Kier.

View project

Planning a scheme?