Cable joint bay construction contractor
We build the joint bays on HV and LV cable routes, install the cable either side, and reinstate each bay after jointing. NERS accredited for civil works and cable laying, LV to 132kV.
Joint bays are civils work
On an 11kV or 33kV cable route, the joints sit in joint bays: pits where cable lengths meet, built by the civils team so a qualified jointer can work clean, dry and safe. We build the bays, install the cable, and reinstate each bay once the jointing is done. We build the route and install the cable. We do not joint or terminate cables, and we do not make the final live connection to the network. The network operator or the client's connection provider does that. On a full connection the jointer comes from the ICP or network operator that holds that scope.
Joint bays we have built
- HV cable installations, Cambridgeshire: two 33kV circuits and fibre over about 25 km between a DNO substation and a new client substation, fully ducted through towns and villages, in the highway, footpath and verge. 45 joint bays built, each fully reinstated after jointing.
- Refurbishment of overhead line circuits, Norfolk: two 33kV and two 11kV underground ducted circuits, in a trench up to 1.6 metres wide, mainly through agricultural land. 13 joint bays and about 31,800 metres of cable.
- Indian Queens private wire, Cornwall: a 7.8km 33kV private wire with about 46km of cable and 19 joint bays. In progress.
- 5 x 33kV with fibre optic, North London: about 53,000 m of 33kV and fibre cable in a double-stacked duct route, with bespoke cable lengths used to reduce joint bay construction.
What we do on a cable route
- Site investigations before excavation
- Trenching in highway, footpath, verge and farmland
- Duct installation, with double-stacked ducts where the trench has to stay narrow
- Joint bay construction, and reinstatement of each bay after jointing
- Cable installation, from 240V to 132kV, with fibre alongside where a scheme needs it
- Reinstatement of the highway, footpath, verge or field
We do the work in-house with our own plant and equipment, with a dedicated contract manager as one point of contact. See HV cable installation for the whole route.
Approvals
We hold full NERS approval for civil works and for cable laying at LV, 11kV, 20kV, 33kV, 66kV and 132kV, with all six distribution network operators, including UK Power Networks. You can check it on the LRQA NERS register. Our supervisors and operatives hold NRSWA street works cards, all our operatives are CSCS/EUSR registered as a minimum and all our supervisors are SMSTS qualified.
How joint bays work
Joint types, how bay positions are chosen, cable pulling, jointer competence and testing are covered in our guide cable jointing and joint bays.
Frequently asked questions
Do you build cable joint bays?
Yes. On our Cambridgeshire 33kV route we built 45 joint bays and fully reinstated each one after jointing. On an overhead line refurbishment in Norfolk we built 13, and the Indian Queens private wire in Cornwall has 19.
Do you do the cable jointing?
No. Our NERS approval covers civil works and cable laying, not jointing. We build the bay, install the cable and reinstate the bay after jointing; the jointing is done by others.
What voltages do you work on?
We build cable routes from 240V to 132kV. Our NERS approval for cable laying covers LV, 11kV, 20kV, 33kV, 66kV and 132kV.
Who do you work for?
ICPs, EPCs, utility contractors and principal contractors.
Where do you work?
Across England and Wales, from our base in Cottenham, Cambridgeshire. Recent cable routes have been in Cambridgeshire, Norfolk, Essex, London and Cornwall.
At a glance
- Cambridgeshire route
- 45 joint bays, about 25 km, 2 x 33kV
- Norfolk route
- 13 joint bays, about 31,800 m of cable
- Cornwall route
- 19 joint bays, about 46 km of cable
- NERS scopes
- Civil works; cable laying LV to 132kV
- Not in scope
- Cable jointing and terminating
- Base
- Cottenham, Cambridgeshire; England and Wales
Talk to us about your scheme
Call 01223 423918 or send the details and we will come back to you.
Send an enquiryRelated projects
All projects
HV cable installations
Two 33kV circuits and fibre over about 25 km between a DNO substation and a new client substation, fully ducted, with 45 joint bays. May 2018 to September 2019.
View project
Refurbishment of overhead line circuits
Two 33kV and two 11kV underground ducted circuits on an overhead line refurbishment: about 31,800 metres of cable and 13 joint bays. August 2020 to May 2021.
View project
Indian Queens private wire: 33kV cable route
A 7.8km 33kV private wire from the Tregonning Solar Farm to National Grid's Indian Queens substation, with about 46km of cable and 19 joint bays. In progress.
View project
5 x 33kV with fibre optic
Five 33kV circuits with fibre for a new data centre and a generation site: about 53,000 metres of cable in a fully ducted route along main roads. August 2018 to April...
View projectRelated services

Multi utility services
Electrical ducts and cabling from 240V to 132kV, fibre ducts, and the routes for several utilities on one site.
Find out more
HV and LV cable installation
Cable routes from 240V to 132kV: trenching, cable ducting, joint bays, cable pulling and reinstatement.
Find out more
EV charging groundworks
Groundworks, civils, ducts, joint bays and cable for EV charging sites, ready for the chargers to be fitted by others.
Find out more
Section 50 licences and street works
What a section 50 street works licence is, who needs one, and how we apply for and manage the licence and highway permits.
Find out more
ICP civils and cable laying
NERS accredited civil works and cable laying, LV to 132kV, for ICPs, IDNOs and EPCs.
Find out more
Substation civils
Transformer bunds, switch rooms, foundations, ducting, drainage and fencing for new substations.
Find out morePlanning a scheme?
Tell us the route, the voltage and the programme, and we will come back to you.