
Substation civils contractor
Transformer bunds, switch rooms, foundations, ducting, drawpits, drainage and fencing for new substations, and the cable routes that feed them. Based in Cottenham, Cambridgeshire, working across England and Wales.
What we build at a substation
- Site preparation, levelling and setting out
- Temporary works design
- Bellmouth and access road
- Groundworks and foundations for substations, switch rooms and transformers
- Transformer bunds
- CCTV bases and ground engineering works
- Trench excavation, troughs, ducting and drawpits for the cable routes, with backfill and permanent reinstatement
- Drainage and manholes
- Palisade, security and perimeter fencing
We do the work in-house with our own plant and equipment, with a dedicated contract manager as one point of contact. We can take on a full turnkey contract or supply our skilled labour.
Thetford primary substation, Norfolk
At Thetford we excavated a 6 km cable route carrying dual 33kV circuits and fibre from UK Power Networks' Barnham substation to the Kingsfleet development. After the cable route, we won the tender to build a new primary substation: two transformer bunds, a customer switch room, CCTV bases, ground engineering works, ducting and drawpits, drainage and manholes, and palisade fencing. See the Thetford project.
Wanlip 11kV substation, Leicestershire
For Kier, at Severn Trent's Wanlip Sewage Treatment Works, we delivered the services enabling and civil works package for a new 11kV substation and Severn Trent's new 11kV switch room, from November 2025 to February 2026. The package ran from site preparation and temporary works design through the bellmouth, access road, foundations, cable trenches, troughs and ducts, to fencing and surface drainage. We are also building the works' inlet civils package inside the live works. See the Wanlip substation project.
Battery storage and grid connections
On a 49.9MW battery storage facility in Cambridgeshire we built the equipment foundations, bunds and walls, and the ducting and cable installation for the 132kV and 33kV cables. At Brentwood, Essex we carried out construction work for a 49.9 MW battery energy storage site next to a 132kV substation. See battery storage and solar farm civils.
The cable routes in and out
We hold full NERS approval for civil works and for cable laying at LV, 11kV, 20kV, 33kV, 66kV and 132kV, with all six distribution network operators. Our longest route is about 25 km of two 33kV circuits with fibre in Cambridgeshire, between a DNO substation and a new client substation. See HV cable installation and ICP civils and cable laying. We build the route and install the cable. We do not joint or terminate cables, and we do not make the final live connection to the network. The network operator or the client's connection provider does that.
Where we work
From Highdrove Farm in Cottenham, north of Cambridge, we work across England and Wales. In East Anglia our substation civils include Thetford in Norfolk; see also our work in Cambridgeshire, Norfolk and Essex.
Frequently asked questions
Do you build substation civils?
Yes. At Thetford we built the civils for a new primary substation, with two transformer bunds and a customer switch room. At Wanlip Sewage Treatment Works we built the civils for a new 11kV substation and switch room, for Kier.
Do you build the cable route to the substation as well?
Yes. At Thetford we excavated the 6 km dual 33kV and fibre route from UK Power Networks' Barnham substation first, then won the tender for the new primary substation. We build cable routes from 240V to 132kV.
Do you work in East Anglia?
Yes. We are based in Cottenham, Cambridgeshire, and our substation civils include the new primary substation at Thetford, Norfolk.
Do you work inside live, operational sites?
Yes. At Severn Trent's Wanlip Sewage Treatment Works we are building the inlet civils package for Kier inside the live works.
Do you install or connect the electrical equipment?
No. We build the civils and the cable routes. Jointing, terminating and the final live connection are done by others.
Can you supply labour only?
Yes. We can take on a full turnkey contract or supply our skilled labour.
At a glance
- Primary substation
- Thetford, Norfolk, 2023
- 11kV substation
- Wanlip STW, for Kier, 2025 to 2026
- NERS scopes
- Civil works; cable laying LV to 132kV
- Not in scope
- Cable jointing, terminating, final connections
- Base
- Cottenham, Cambridgeshire; England and Wales
- Also
- ISO 9001, 14001 and 45001, Achilles UVDB Silver+, Constructionline Gold
Talk to us about your scheme
Call 01223 423918 or send the details and we will come back to you.
Send an enquiryRelated projects
All projects
Thetford cable route & civil build
A 6 km route with dual 33kV circuits and fibre from UK Power Networks' Barnham substation, followed by the civils for a new primary substation. 2023.
View project
Wanlip STW 11kV substation build
Services enabling and civil works for a new 11kV substation and Severn Trent's new 11kV switch room at Wanlip Sewage Treatment Works, for Kier.
View project
Construction of 49.9MW battery storage facility
All the civils, drainage and electrical ducting for a new 49.9MW battery storage facility. February to October 2021.
View project
49.9 MW battery energy storage
A 49.9 MW battery energy storage site at Brentwood, next to a 132kV substation. January to October 2022.
View projectRelated services

Civil construction
Deep excavations, reinforced concrete foundations and structures, substation and compound civils, drainage.
Find out more
HV and LV cable installation
Cable routes from 240V to 132kV: trenching, cable ducting, joint bays, cable pulling and reinstatement.
Find out more
EV charging groundworks
Groundworks, civils, ducts, joint bays and cable for EV charging sites, ready for the chargers to be fitted by others.
Find out more
Section 50 licences and street works
What a section 50 street works licence is, who needs one, and how we apply for and manage the licence and highway permits.
Find out more
ICP civils and cable laying
NERS accredited civil works and cable laying, LV to 132kV, for ICPs, IDNOs and EPCs.
Find out more
Cable joint bay construction
Joint bays built on HV and LV cable routes, and reinstated after jointing.
Find out morePlanning a scheme?
Tell us the route, the voltage and the programme, and we will come back to you.
