Ground Utilities banner on the fence of a substation
Services

Substation civils contractor

Transformer bunds, switch rooms, foundations, ducting, drawpits, drainage and fencing for new substations, and the cable routes that feed them. Based in Cottenham, Cambridgeshire, working across England and Wales.

What we build at a substation

  • Site preparation, levelling and setting out
  • Temporary works design
  • Bellmouth and access road
  • Groundworks and foundations for substations, switch rooms and transformers
  • Transformer bunds
  • CCTV bases and ground engineering works
  • Trench excavation, troughs, ducting and drawpits for the cable routes, with backfill and permanent reinstatement
  • Drainage and manholes
  • Palisade, security and perimeter fencing

We do the work in-house with our own plant and equipment, with a dedicated contract manager as one point of contact. We can take on a full turnkey contract or supply our skilled labour.

Thetford primary substation, Norfolk

At Thetford we excavated a 6 km cable route carrying dual 33kV circuits and fibre from UK Power Networks' Barnham substation to the Kingsfleet development. After the cable route, we won the tender to build a new primary substation: two transformer bunds, a customer switch room, CCTV bases, ground engineering works, ducting and drawpits, drainage and manholes, and palisade fencing. See the Thetford project.

Wanlip 11kV substation, Leicestershire

For Kier, at Severn Trent's Wanlip Sewage Treatment Works, we delivered the services enabling and civil works package for a new 11kV substation and Severn Trent's new 11kV switch room, from November 2025 to February 2026. The package ran from site preparation and temporary works design through the bellmouth, access road, foundations, cable trenches, troughs and ducts, to fencing and surface drainage. We are also building the works' inlet civils package inside the live works. See the Wanlip substation project.

Battery storage and grid connections

On a 49.9MW battery storage facility in Cambridgeshire we built the equipment foundations, bunds and walls, and the ducting and cable installation for the 132kV and 33kV cables. At Brentwood, Essex we carried out construction work for a 49.9 MW battery energy storage site next to a 132kV substation. See battery storage and solar farm civils.

The cable routes in and out

We hold full NERS approval for civil works and for cable laying at LV, 11kV, 20kV, 33kV, 66kV and 132kV, with all six distribution network operators. Our longest route is about 25 km of two 33kV circuits with fibre in Cambridgeshire, between a DNO substation and a new client substation. See HV cable installation and ICP civils and cable laying. We build the route and install the cable. We do not joint or terminate cables, and we do not make the final live connection to the network. The network operator or the client's connection provider does that.

Where we work

From Highdrove Farm in Cottenham, north of Cambridge, we work across England and Wales. In East Anglia our substation civils include Thetford in Norfolk; see also our work in Cambridgeshire, Norfolk and Essex.

Frequently asked questions

Do you build substation civils?

Yes. At Thetford we built the civils for a new primary substation, with two transformer bunds and a customer switch room. At Wanlip Sewage Treatment Works we built the civils for a new 11kV substation and switch room, for Kier.

Do you build the cable route to the substation as well?

Yes. At Thetford we excavated the 6 km dual 33kV and fibre route from UK Power Networks' Barnham substation first, then won the tender for the new primary substation. We build cable routes from 240V to 132kV.

Do you work in East Anglia?

Yes. We are based in Cottenham, Cambridgeshire, and our substation civils include the new primary substation at Thetford, Norfolk.

Do you work inside live, operational sites?

Yes. At Severn Trent's Wanlip Sewage Treatment Works we are building the inlet civils package for Kier inside the live works.

Do you install or connect the electrical equipment?

No. We build the civils and the cable routes. Jointing, terminating and the final live connection are done by others.

Can you supply labour only?

Yes. We can take on a full turnkey contract or supply our skilled labour.

At a glance

Primary substation
Thetford, Norfolk, 2023
11kV substation
Wanlip STW, for Kier, 2025 to 2026
NERS scopes
Civil works; cable laying LV to 132kV
Not in scope
Cable jointing, terminating, final connections
Base
Cottenham, Cambridgeshire; England and Wales
Also
ISO 9001, 14001 and 45001, Achilles UVDB Silver+, Constructionline Gold

Talk to us about your scheme

Call 01223 423918 or send the details and we will come back to you.

Send an enquiry

Planning a scheme?

Tell us the route, the voltage and the programme, and we will come back to you.