5 x 33kV with fibre optic
Five 33kV circuits with fibre for a new data centre and a generation site: about 53,000 metres of cable in a fully ducted route along main roads. August 2018 to April 2020.
The project
Two customers in North London needed five 33kV circuits with fibre optic protection, in preparation for a new data centre and to export power from a generation site. Ground Utilities built a fully ducted route for both clients along main arterial roads into London.
Scope of works
- A fully ducted route along main arterial roads
- Ducts double-stacked to reduce the trench width
- Crossings of waterways and major road intersections, and work within Type 0 road construction
- Bespoke cable lengths to reduce the number of joint bays
- About 53,000 metres of 33kV and fibre cable installed
- 24-hour working to reduce disruption to the programme
Result
The work was completed within the timescale. Haringey and Enfield councils both commended how well it was carried out.
See our HV cable installation service, 240V to 132kV, for what a cable route involves, and the cable ducting guide.
Project facts
- Location
- London
- Type
- Cable Installations
- Started
- August 2018
- Completed
- April 2020
- Services
- Multi utility services
Related projects
All projects
HV cable installations
Two 33kV circuits and fibre over about 25 km between a DNO substation and a new client substation, fully ducted, with 45 joint bays. May 2018 to September 2019.
View project
Irrigation main installation
A high-pressure irrigation main with thrust blocks, two road crossings, reinstatement and full system testing. February to March 2021.
View project
Refurbishment of overhead line circuits
Two 33kV and two 11kV underground ducted circuits on an overhead line refurbishment: about 31,800 metres of cable and 13 joint bays. August 2020 to May 2021.
View projectPlanning a scheme?
Tell us the route, the voltage and the programme, and we will come back to you.