Irrigation main installation
A high-pressure irrigation main with thrust blocks, two road crossings, reinstatement and full system testing. February to March 2021.
The project
Ground Utilities installed a high-pressure irrigation main in Essex, including the testing. The main runs across ground with varying inclines, which made the setting out demanding, and has a road crossing at each end of the route.
Scope of works
- Trenching and pipe bedding
- Installation of the irrigation pipework, including welding and jointing
- Thrust blocks at specific points on the main
- Two road crossings
- Reinstatement of the trenches, with warning tape
- Testing of the whole system
The works were completed within the timescale.
See waste water and drainage for more on this kind of work.
Project facts
- Location
- Essex
- Type
- Irrigation
- Started
- February 2021
- Completed
- March 2021
- Services
- Multi utility services, Waste water
Related projects
All projects
Deep excavations for sewer and water service
Fifteen excavations, more than 3 metres deep at the deepest, to expose and support an existing sewer and other utilities for a diversion route. August to October 2021.
View project
HV cable installations
Two 33kV circuits and fibre over about 25 km between a DNO substation and a new client substation, fully ducted, with 45 joint bays. May 2018 to September 2019.
View project
5 x 33kV with fibre optic
Five 33kV circuits with fibre for a new data centre and a generation site: about 53,000 metres of cable in a fully ducted route along main roads. August 2018 to April...
View projectPlanning a scheme?
Tell us the route, the voltage and the programme, and we will come back to you.