11kV cable installation at whittle laboratory
Irrigation

Irrigation main installation

A high-pressure irrigation main with thrust blocks, two road crossings, reinstatement and full system testing. February to March 2021.

The project

Ground Utilities installed a high-pressure irrigation main in Essex, including the testing. The main runs across ground with varying inclines, which made the setting out demanding, and has a road crossing at each end of the route.

Scope of works

  • Trenching and pipe bedding
  • Installation of the irrigation pipework, including welding and jointing
  • Thrust blocks at specific points on the main
  • Two road crossings
  • Reinstatement of the trenches, with warning tape
  • Testing of the whole system

The works were completed within the timescale.

See waste water and drainage for more on this kind of work.

Project facts

Location
Essex
Type
Irrigation
Started
February 2021
Completed
March 2021
Services
Multi utility services, Waste water