Multiple utility services in Essex
Deep excavations so HV and LV cables, drainage and water could be lowered and diverted, working with the asset owners. May to October 2021.
The project
Deep excavations on a site in Essex, so that existing utilities could be dropped to a greater depth and protected from the ground works. The utilities were HV and LV cables, drainage and water. The diversions were carried out by the asset owners, working with Ground Utilities.
The works were completed within the timescale.
See multi utility services for more on this kind of work.
Project facts
- Location
- Essex
- Type
- Multiple Utilities
- Started
- May 2021
- Completed
- October 2021
- Services
- Multi utility services
Related projects
All projects
HV cable installations
Two 33kV circuits and fibre over about 25 km between a DNO substation and a new client substation, fully ducted, with 45 joint bays. May 2018 to September 2019.
View project
5 x 33kV with fibre optic
Five 33kV circuits with fibre for a new data centre and a generation site: about 53,000 metres of cable in a fully ducted route along main roads. August 2018 to April...
View project
Irrigation main installation
A high-pressure irrigation main with thrust blocks, two road crossings, reinstatement and full system testing. February to March 2021.
View projectPlanning a scheme?
Tell us the route, the voltage and the programme, and we will come back to you.