Deep Excavation for Sewer diversion route as part of a new development, in South West London. Excavations to 3.3mt deep exposing and supporting existing sewer along with other utilities in the same excavations.
A new construction of a 49.9MW Battery Storage facility in Cambridgeshire. Works consisted of all Civil, Drainage, and Electrical Ducting to the entire site.
North London, a two-customer requirement of 5 x 33KV circuits with Fibre Optic Protections, in preparation for a new data centre and to export power from a Generation Site.
A 33kV/11KV Refurbishment of overhead line circuits in Norfolk which comprised of the Installation of 2 x 33kV underground Ducted Circuits and 2 x 11kV underground Ducted Circuits.
Excavation/Reinstatement, HV and Fibre cable installation of 2 x 33KV cable circuits for approximately 25km between a DNO Substation and new Client Substation.