North London, a two-customer requirement of 5 x 33KV circuits with Fibre Optic Protections, in preparation for a new data centre and to export power from a Generation Site.
Lorem ipsum dolor sit amet, dolor sit amet dolor sit amet.
North London, a two-customer requirement of 5 x 33KV circuits with Fibre Optic Protections, in preparation for a new data centre and to export power from a Generation Site. All circuits from the same Substation and with 0.5miles of point of connections.
The works consisted of a fully ducted route for both clients through main arterial roads into London. To reduce trench width a double stack of ducts was required.
The route crossed waterways, major road intersections and within Type 0 road constructions, bespoke cable lengths were also required to enable reduction of Joint Bay constructions, approximately 53,000mts of 33KV and Fibre cable were installed.
24hr working was required to reduce programme disruption.
This project received commendations from both Haringey and Enfield councils for how well it was carried out and within timescales.